Main elevation
From an architectural point of view, the building to be intervened does not communicate the activity to be installed, of technological production. It is proposed to apply a metallic coating and framing to the existing openings using “frames” in composite aluminum sheet
Exterior view
With this intervention, the “housing and domestic” character of the existing openings will be transformed, resulting in a sophisticated global image, accordingly with the activity to be installed.
Reception area
Reception area and stairs
Leisure area
The entrance and reception space are completely absorbed by the imposing staircase leading to the first floor, in a disproportionate way.
It is proposed the implementation of an oblique service desk that conceals the existing staircase, while directing the visitor or worker to the living area that articulates with the distribution corridor of the production and storage areas on the ground floor. For the ceilings in the reception area, it is proposed to be made in false ceiling and in the living area that the structure of the building is visible, painted in dark gray. The idea is to create a set of lights with LED suspended lighting. Here, the accent wall also appears, with a phrase in backlit letters.
Hallway
Hallway
Dining and training area
Meeting room and office
Axonometry (ground and 2nd floor)